Favourite Photos...

Favourite Photos...
Reading Lines GP35 #3647

Middletown, Pa

Friday 31 May 2013

More work on the piping for the chemical transfer facility...

More piping being applied to the transfer facility that will feed the manufacturing plant...




More to follow soon.

Jas...

Monday 27 May 2013

Another action packed day on the L&T Branch...



Another action packed morning railfanning the L&T Branch...
RDG #3647 & #3655 (both GP35's) take the siding with two gons loaded with steel coils for the stamping plant...
Gons spotted on the stamping plant siding ready for unloading...
Jas...

Tuesday 7 May 2013

Colourful Chemicals - Another new L&T Industry...


Well the next structure and industry to be constructed on the L&T is a Chemical Transfer Building, this structure is associated with the Appliance Manufacturing Plant and will transfer both solid, liquid & gas chemicals to the various areas within the wider manufacturing plant.
It is located on the spur that leads to the plastic pellet unloading shed, and will hold two to three tank cars.  There will be an unloading rack with various points for different chemicals and as such will make switching crews have to pay attention to their spotting of the right tank car to the right unloading point.

The small building front will be for unloading of solid chemicals from box cars onto the unloading dock.  The building itself is again another Walthers - Modular Kit made into a building flat.  The photo backdrop for the industry has already be chosen and works in really well with the surround backdrops and area.






More to follow soon...
Jas.

Monday 6 May 2013