Installing the last of the dwarf signals on the layout...

Over the past week I have been working on the last set of dwarf signals for the layout.  
These are again the Tomar brand that I have converted to include the RR Cirkits - Tri Coloured LED's.


The making and installation of these now goes very quick.  I have the process down to about 30 mins to make up the LED including soldering all four 36 Awg wires, glue in the LED, and paint the casing silver.


Next step will be to install the Digitrax Terminal Strip Mounting Kits (TSMK) and wire them up to the SE8C boards.


This is the final lot of signals for the signalling system on the layout.  Once these are installed and operational it will be the final stage of the detection and signalling completed.