One of the first of the unfinished jobs that I wanted to complete since the JL&T received it's reprieve was to get an internet connection in the layout room.
Because of the distance between the house and the layout room, and the shed being constructed with metal sheeting (colourbond) WiFi was not going to be a viable option. So I needed to run a hard wire Cat5 cable from our study to the layout room.
So yesterday I ran 65 metres of Cat5 from the study through the rook space and down through a conduit in the backyard to the shed. The cable just reached and just needs the ends terminated and connected to the modems.
Cheers,
Jas...
Well the Internet is now hard wired into the layout room, and we are ready to start chatting with other model railroader. If anybody would like to have a chat via Skype or Facetime/iChat you can send us a request for Skype to jlandtrailroad or for Facetime/iChat just email us through the blogger email.
ReplyDeleteCheers,
Jas...