Well yesterday I decided to add a little more storage to the L&T branch. I had enough room to add about 2" of real estate to the front of the bench work, so I have added another track to the front.
This will be either the main of a storage/passing siding of the main, it will be able to hold a significant length train that could then be broken down into the various industries on the L&T.
The first stage has been to add the 45mm strip of pine framing timber, then the 17mm plywood, 10mm drywall/plaster and finally to finisih I have to add the 3mm cork roadbed.
Cheers,
Jas...
No comments:
Post a Comment