Well I had another good couple of hours the other day to make a start on the third structure for the L&T. This structure needs to be completed so that I can begin and complete all of the scenery in the corner that is at the start of the L&T and tot he right of the JL&T module.
To be able to progress with the scenery I need to complete this section. This structure also forms part of the "hiding" of the entrance hole through the backdrop from the JL&T centre peninsula to the JL&T module. The structure itself will form part of the Appliance Manufacturing Plant.
I have decided to add a single car siding to this structure as well, after getting the bulk of the structure in place the area supports it quite well. And I did want to have a siding here too, there will only be single 50' boxcar unloading into this siding.
The entrance from the west side of the centre peninsula onto the L&T branch, the switch will be operated via a Tortoise...
The building will have a truck loading dock to the left...
Shot showing the entrance from the centre peninsula into the JL&T module...
Cheers,
Jas...
No comments:
Post a Comment