Productive day today, got the new track configuration in for the Shippensburg East - Yard Lead.
As an added benefit it allowed the Harrisburg East Lead to be straightened out too, I also connected the yard lead to the Harrisburg East main.
Much happier with the flow with the new design, and operations will benefit greatly from the changes too.
Next phase is to wire it all in to the blocks, and then install the Tortoise Motors...
No comments:
Post a Comment