Over the past week I have been making the last few single & double head dwarf signals to be placed onto the layout.
I also had to re-position the Shippensburg signal bridge to be in a more prototypical position after I installed the new Peco - Unifrog - Double Slip Switch.
The re-positioning has allowed for an extra 8-10" of mainline track to be gained between the previous block boundary/signal mast.
Jas...
No comments:
Post a Comment