Favourite Photos...

Favourite Photos...
Reading Lines GP35 #3647

Middletown, Pa

Tuesday, 23 March 2021

Bridge Track Work Alignment...

Today’s project was the realignment of the track work leading into both bridges, from both north & south that cross the Susquehanna River.

To facilitate the ballasting of the remaining track on the north side, I had to trim down the track work so that it finished flush with the bridge abutments and trim the bridge track too.

Now that this is completed I can finish off the terrain on the south side of the layout bridges (Harrisburg), paint the single truss bridge, paint the bridge track & CA the track to the bridges ready to be installed.

No comments:

Post a Comment