Favourite Photos...

Favourite Photos...
Reading Lines GP35 #3647

Middletown, Pa

Saturday 24 April 2021

Road Bridge - Backdrop Transition - Part 2...

Working on the road bridge to backdrop transition again today.

The left section of the road bridge tapers from the right to left.  To accomplish a smooth join I scribed the level height of the bridge into the backdrop and carved a groove into the drywall backdrop for the 1.5mm styrene sheet to sit in.

I then glued the overpass concrete railing to existing section, and the section of styrene sheet roadbed.  Once this had dried, I then glued the styrene I beams into place under the roadbed.

Again, once the tractor trailers are placed into position it hides the translation further & blocks the viewable edge of the backdrop too.

No comments:

Post a Comment