Favourite Photos...

Favourite Photos...
Reading Lines GP35 #3647

Middletown, Pa

Friday, 22 June 2012

Kato - Reading Lines GP35 - Finished and on it's way...

Well last night I got word that our Kato Reading Lines - GP35 was completed and ready to be shipped to the JL&T here in Australia.

Below are some photos from Jim's website that he posts for his builds for clients to see, one other thing that Jim also does is post some short video footage of the locomotive in action on his layout to show the operation, and additions that he does for you.



Seriously cannot wait to get this onto the JL&T and do it's inaugural run...
Jas...

Saturday, 16 June 2012

The joys of Kit Bashing & Scratch Building Structures...


Well the other day I altered the design of the first industry on the L&T Branch, I decided to change the width of the modulars on the left hand side to allow for cars to be spotted on the spur better.
When I altered the position of the left hand side of the building I placed it on a 30 - 45 degree angle, this was to help hide the access hole edge.  But by doing so I also had to get creative with the modular parapet and some way of maintaining the angle.
Shot showing the angle of the walls for the left hand side...
I started by placing this section on the layout with the tabs locked in as they are, I then marked the cork subbed with a marker to maintain the angle.  I carefully placed a few small dabs of CA onto the bottom, middle & top tabs to lock them and the angle in place.  Once the piece had cured I then made up some small Plastruct supports that would be glued internally to support the two walls and maintain angle.
Shot showing the two support braces glued in, supporting the two walls, and maintaining the angle...
Next I had to alter the modular parapet wall so that I was able to obtain the right angle of the walls.  I place the structure onto the workbench and marked the angle onto a piece of paper with a marker.  I then used a piece of course drywall sanding block paper to sand down the parapet to the right angle.
Showing the angle sanded into the modular parapet...
Once the angle was correct I then had to file down ledge on the bottom that supports the modular roof sections, this allowed the parapet to sit correctly on the modular wall.
Then once both parapets had the correct angle they were glued with CA to the section.  The only downside of the modulars is that sometimes the fit can be hard to get right.  But once undercoated, final brick colour and weathering are added it will be hard to pick up the little gaps in some sections.
The completed parapets glued into position...
One trick that can be employed with the modular wall sections is to use Plastruct strips as decorative ledges.  The corner section on the two walls normally has a 90 degree brick section covering each wall panel.  To cover this I will be adding 5mm Plastruct strips that will be concrete columns, this will help strengthen the entire structure and also hide the corner join completely.
Another method that can also be employed is to use round or square Plastruct strips as downspouts or service pipe runs to hide seams & joins.
Shot showing the completed piece in place against the Walthers kit...
The next step is the finish off the small pieces that have to be blended into the Walther's kit on both sides.  Then it will be a matter of hiding the kit seams, adding the concrete column strips to the left side.
The right side was fairly straight forward, and is more of the modular wall sections.  The backdrop return had to be cut down which only requires a few score lines with a Exacto knife to snap the excess wall off.  Some care does need to be taken if the score line is close to a wall or door as it can damage these pieces.
The right had side of the industry is going to be a loading/unloading area for heavy vehicles...
More to come over the next few days as I progress on the build.
Jas...

Friday, 15 June 2012

Better Fit & Better Visually...


Well today I decide to reduce the left hand side of the building that goes through the access hole down to one set of modular pieces.
I also added another set to the right hand side as Rich recommended.  I'm very happy with the way the building not only looks now, but also operates as far as spotting cars goes.  I can get one car into the far left side without it fouling the turnout.
I also re-adjusted the brickwork and configuration of the modules to suit the final design and placement of the pipe gantry the will enter the building and hide the plaster seam.
The right hand side has had one more set of modules added to the far right and the top.
Shot showing the clearance from the spotted car to a car traversing across the turnout, although tight it fits.
Now all that is left is to add the final parapets to the modules, add the returns back to the backdrop, add the roof sections and choose a brick colour.
Jas...

Monday, 11 June 2012

A tweak here and a tweak there...


Well I have made a few little adjustments here & there. 
 Here is an overall shot of the industry as it stands tonight...
As stated earlier I have moved the left had building out on a 45 degree angle so that the building is moved along the track a little more.
Shot from the main centre peninsula, looking through the access hole to the JL&T Module...
I'm still decide if the left hand side will be one section in width or two sections as it is now.  The reason being if I leave it as is the spotting of a car anywhere along the dock will foul the switch.  No big deal just means I have to move further along the branch to the next switch and do a reversing back to drop off more or pick up.
I've also added a small loading dock to the right hand side, this will also tie the Commissary Building into the backdrop.  It will allow a small scene to made in the area too.  It will also blend a small dead end road into the dock and the other industry that will be on the opposite side of the road.
Shot showing the loading dock area on the right, and a car spotted blocking the switch...
Next step will be to decide how wide I want the left hand side and if I want the switch fouled.  Then finish off the 90 degree returns back to backdrop, add the parapets, strengthen the structure with Plastruct tube & I Beams.
Jas...

Sunday, 10 June 2012

Hiding a hole...

Hi All,

Well this afternoon I decided to tackle one of the challenging aspects of the layout.  There are two holes that penetrate the centre peninsula backdrop, these hole allow access from the main centre peninsula to the JL&T module and the L&T Branch.



Not only do I have to hide the sides but also the join between the hole on the backdrop, so tonight I decided to make a start and mock up a building.  The main section of the industry (yet to be decided) is the Walthers Commissary Building, and some Walthers - Modulars Sections.


The idea is to use the building to hide the sides of the access hole, I will use a pipe gantry on the L&T side to hide this join.  And on the opposite side I plan on using a billboard of some description.
I may even alter the angle of the section in the access hole so that it comes out on a 45 degree angle to add a feature visually.



The underside of the access hole will be painted eventually the same colour to hopefully hide the remaining timber, but due to it's position it shouldn't be seen.  It has taken me a little while to get to this stage as I haven't been able to visualise the final building.

Stay tuned as we progress on the first structure to take place on the L&T Branch.

Jas...

Saturday, 9 June 2012

UPCOMING LOCOMOTIVES to the JL&T Roster...

Well today I got word that one of my new locomotives was progressing nicely and nearly 90% complete.

The locomotive is a Kato RDG GP35 it is rare (I haven't been able to find any) and I actually thought I wasn't going to be able to get one of these for the JL&T Roster.

There are lots of custom detail parts being added, along with Tsunami Sound, Decals, LED's & Custom Weathering.

All this is being done by Jim Rinker, who is an amazing modeller and actually lives in Reading, PA.  How appropriate to have a RDG locomotive being done in Reading...

Jim has his own custom modelling website here:  Delano Mountain Custom Modelling

Jim does amazing work and I have been following his progress on his website and his very own Youtube channel too, which is here:  Delano Mountain Custom Models - Youtube Channel.

Anyhow these are the progress photos to date...


As you can see Jim does some amazing work, and I cannot wait for it to land here so it can take it's place on the JL&T.  I will do a full review of the GP35 when it lands for all following the JL&T blog.

Jas...

Saturday, 2 June 2012

New Locomotive to the JL&T Roster...


Hi All,
Well this week I finally added a EMD SD40-2 to the JL&T roster.  I have been searching high & low for these and was lucky enough for one to pop up on eBay.
As soon as it was spotted, it was purchased!  There was no way I was letting it go, they are getting to be like rocking horse poop (hard to find).  I have another one Kato - Conrail that is currently being weathered along with another Kato GP35 in RDG paint.
This model in the Athearn RTR - Conrail #6364.  It is DCC Ready and will eventually get a full Tsunami GN1000 upgrade with sound & LED's.
Cheers,
Jas...

New Flat Cars & Heavy Loads...


As well as a new series of locomotives I have been giving eBay a hammering too.  I have found some really fantastic vendors that have had pieces that I wanted, and were getting harder to find over here.
So first cab of the rank is a series of six (6) 60' Flat Cars - 3 TTX & 3 Trailer Train.  These have already been put to work hauling some John Deere Graders (Athearn).


As well as the Flat Cars, I also managed to pick up some Heavy Duty Flat Cars, these were put straight into service hauling a pair of Cat Log Loaders...  I think I may see another industry for the JL&T!
The tie downs were done using plastic coated decoder wire, I haven't got and Ezyline yet, but the time being they work!  Was a very enjoyable night securing them down to the flat cars.
These make fantastic loads and should be great fun for an industry and ops sessions, either split in a mixed manifest or a dedicated extra with some heavy hitting hauling power...
Jas...

Wednesday, 23 May 2012

L&T Branch - Track Work Completed...


Well today I got a major run at installing the remaining track work and electrical feeders, and we have finally finished!  This marks a pivotal point for the JL&T because it is the completion of the major portion of track work for the top deck.
Apart from a few sidings and spurs to be finalised and added there is no more track work to be installed, this means I can now move onto other aspects.  Either installing the remaining tortoises for the mainline or looking at signals and CTC.
Anyhow here are a few photos of the completed L&T Branch...
More to follow as I start to install some structure, scenery and begin to weather and detail the area...
Jas...

Sunday, 20 May 2012

JL&T Module - Inaugural Locomotive Run

Here is a short video of the very first powered locomotive to venture onto the JL&T module.  This is now connected to our layout via the L&T Branch...


Cheers,

Jas...

Thursday, 17 May 2012

JL&T Module connected to the L&T Branch...

Well tonight marked the first track work to be done on the L&T branch and the layout in general since I had a little break whilst sorting out our house issues.




I managed to connect (for the very first time) the JL&T Module to the layout, the L&T Branch to the main layout too.  This was achieved via a 90 degree crossover located on the L&T Branch.
The JL&T Module has been powered and for the very first time since it was constructed a locomotive under it's own power rode the rails onto the JL&T Module, to mark this auspicious occasion a small video was produced that I will get to over the next couple of nights and post later.




So stay tuned for more, once the track work on the L&T Branch is finished I'll be able to start adding scenery and all the fun stuff...
Cheers,
Jas...

Wednesday, 16 May 2012

JL&T Railroad Blog - Cleaning Up a few Small Jobs...


Hi All,
Well today I started back on the JL&T and the first of several small jobs to be completed was a quick tidy up, and the installation of a backing board for the work station & maintenance area.


This will be used to store all the odds & ends I've accumulated now and certainly more into the future, the right hand side may also be used as our Control Panel for CTC when I get around to installing everything that goes along with it.
This area will also house the dispatcher for future operating sessions, it has the main PC running JMRI, and also the NCE power pack and Command Station.
Next step will be to do some track work on the L&T Branch, and some more lining of the walls in this area.
Cheers,
Jas...

Wednesday, 9 May 2012

JL&T Railroad Blog - Layout gets Broadband/Internet...

Hi All,

One of the first of the unfinished jobs that I wanted to complete since the JL&T received it's reprieve was to get an internet connection in the layout room.

Because of the distance between the house and the layout room, and the shed being constructed with metal sheeting (colourbond) WiFi was not going to be a viable option.  So I needed to run a hard wire Cat5 cable from our study to the layout room.

 



So yesterday I ran 65 metres of Cat5 from the study through the rook space and down through a conduit in the backyard to the shed.  The cable just reached and just needs the ends terminated and connected to the modems.


Hopefully in the next couple of days I will a dedicated internet connection in the layout ready to stream some layout time via Skype / Facetime - iChat for any of you who'd care to drop in and have a look.

Cheers,

Jas...