Favourite Photos...

Favourite Photos...
Reading Lines GP35 #3647

Middletown, Pa

Tuesday, 9 April 2013

Scratch building a Loading Ramp, while you wait...


So this morning whilst waiting for the ballast to dry, I decided to start the loading ramp for the L&T Branch entrance.
It will serve the industry on the left hand side of the entrance, it is being scratch built out of Evergreen styrene.
Ramp section being built using styrene to brace the sections.



Internal structure to support the styrene top...


And all finished in about 3 hours, next step is to paint it a concrete colour and then weather it...



Jas...

Saturday, 30 March 2013

Tom Patterson's CWE Layout...

Just thought I'd put up some YouTube footage of a good friend of mine and fellow MRH forum members, CWE Layout.

Tom has an amazing eye for detail, and his scenery work is outstanding.  This is one layout that I use for reference, and inspiration and hope that the JL&T looks like this one day...






Jas...

Thursday, 28 March 2013

Weathering Completed...


Well today I had a great run at weathering the last of the structures around the L&T Branch entrance.  Again the majority of the weathering has been achieved with weathering powders.
The only different type of weathering used has been a powder wash in isopropyl alcohol.  I'm starting to get quite used to the powders and how to apply them, and each time experimenting with something different is yielding great results.
And the structure in place...
  
Jas...

Sunday, 24 March 2013

The L&T Branch gets a working grade crossing...


Last night I fully installed our Walthers - Cornerstone Cantilevered Crossing Signals.  I used a Circuitron FL2 Flasher Kit, which is installed as a manual operating crossing.
The lights are activated via a push button on the fascia, and will be operated by switch crews working this spur off the L&T Branch.
Took a little over two hours, and all that it requires now is a sound module to be installed, anyone with ideas about where to get one please let me know as I've only found one to date.
Jas...

Tuesday, 19 March 2013

Window Frames & Something a little Special...



Well tonight I had a few hours on the weathering, window frame and something a little special on the structures for the L&T.
I was working mainly on the smaller structure tonight (right of the L&T main) adding window frames and some brick detail.
And yes for those that have picked it up, there is a lit LED flood light on the side.  These a BRAWA model LED that come pre solder with resistor and just needed to be wired up to a 9V supply, all that remains is to weather the light case to the same as the remainder of the building.
The only real changes to this building was the addition of a little wash in a few spots, the window frames and some extra brick detail via some odd coloured bricks.
More to follow.
Jas...

A few washes...


Hi All,
Well today I added a few washes using some Isopropyl Alcohol & Black Weathering powders.
Seeing this is my first attempt at weathering using washes, I'm extremely happy with results and will be using this method again.  All that is left is to add the windows, loading bay door and detail parts and we are almost ready for the layout.
Jas...

Painted & Weathered...


Hi all well a update on the progress on hiding the seams/gaps on our Walthers - Modular Kits.  I have airbrushed both structures and done the initial round of weathering.
Both airbrushed and ready for weathering...
The first structure was painted a red oxide colour for the main brickwork and weathered with AIM weathering powder, then the concrete window sills and concrete decorative pieces painted with aged concrete...
There will be more weathering added to this, namely water marks, and more dirt, then a final coat of Dullcote to seal.
The second structure was weathered with a black pastel powder wash diluted in water, there will more details again along the lines of water run marks, rust from downspouts (to be added) and some dirt and diesel stains above the loading dock.
And here a few shots overall of the L&T entrance as it stood last night with the structures in place...
More when they are both finished and in place...
Jas.

Wednesday, 13 March 2013

Hiding - Walthers Cornerstone Modular seams...


For awhile now I have been trying to think of way to hide the joins/seams that are left when using Walthers - Cornerstone Modular kits.  I like the flexibility that the modular kits offer, and the fact that the design and layout of each building is only limited by your own imagination and requirements.
But one down side of the modular kits is the fit and the pesky gaps that are left when joining the sections together.

This is actually a fairly good example of the gap that is left behind when joining the sections, after a couple of coats of undercoat and two or three layers of final colour these gaps sometimes are hard to pick.  But more often that not they can be seen, one option would be to fill the gaps with putty but this would be time consuming and could easily allow the mortar lines to be lost.
So the solution that I thought of was to add a facade detail that would eliminate or hide the seams/gaps.  So I sourced a styrene strip that would suit the structure as a ledge or structural member exposed to the facade.  I tried a piece of Evergreen Styrene that was 4x6 in HO Scale and it was perfect.
I cut the sections to fit in between the modular sections and to cover the vertical columns, the column pieces extend over the centre sections by a 1mm either side.  These are then glued in place using CA, and are aligned so the top of the styrene piece is underneath the seam/gap.
And the finished result once the entire structure has been fitted...
The ledge will be painted a weathered concrete colour when finished and will also help break up the single colour of the brickwork on larger facades.  In all this building took around an hour to add all the ledge detail, and proven to be a winner in hiding the gaps.  Although the real proof will be when the structure is painted and weathered.
I also completed a smaller structure with a angle in the middle using the same method.  I like it that much that I will be using this method on the remaining structures on the L&T Branch & the JL&T RR.
I'll post more photos once these two structures have been painted and weathered.
Jas...

Tuesday, 5 March 2013

Asphalt & Concrete - Ballast & Dirt...


Well yesterday was a very productive day I managed to get the asphalt entrance and concrete loading area finished, and the remaining gravel/dirt in the ROW.
I'd forgotten how long it can take to blend the right colours when using an airbrush.  Because I was working in an already completed section (JL&T module) I had to blend the new area into the existing the module.
Also I had actually forgotten the process of how I obtained the existing concrete colouring and weathering, so this was like starting over again.  But I'm happy with the results so far.
Remaining steps are to add ballast throughout the area, start the painting and weathering of the backdrop structures, start to think about what detail parts I want to add to the scene.
Jas...

Friday, 1 March 2013

Airbrushing Asphalt...


Well today was another day of airbrushing the new entrance & unloading area for the new industry located on the L&T entrance.
I decided to do the entrance and main unloading area as a newish asphalt area and the remaining section in concrete.
This is just the first two layers, base layer of PS SP Dark Grey follwed by blending of CSX Grey.  I'll be adding some very light hints of PS Sand around the edges to simulate dirt and the doing a few more passes to blend everything in.
Jas...

Tuesday, 26 February 2013

Ground Scenery finished...


Just a quick update on the ground scenery that was completed tonight after drying this afternoon, and a few photos...
Zip texturing complete...
Jas...

Monday, 25 February 2013

Rail Ties painted & Ground Formed...


Well today was a major push forward for the scenery on the L&T Branch, although it was hard work as the temp was about 37 degrees with the humidity pushing around the 80 - 90% mark.  Not the most ideal conditions to be airbrushing and applying ground goop full of plaster and portland cement.
First point of call was the airbrushing of the railroad ties...
Colour is Polly scale (PS) Roof Brown, the mix is thinned 1:1 (Paint/Thinner).  All applied with an Aztec airbrush, after the paint had dried I went over random ties with a paint pen (Tie Brown) with a darker shade to highlight.
To finish I then went over the rail tops with a Maklin Track Cleaning Block, its amazing how even painting the rail & ties makes a difference.
Next stage was to add some Ground Goop (my term for Joe Fugate's Ground Mix), the mix is a combination of:
1 x Part - Portland Cement
3 x Parts - Patching Plaster
4 x Parts - Fine Vermiculate
This is mixed with water to a consistency close to that of patching plaster.  This was then applied to the areas with the masking tape.
Once this is spread out onto the layout and formed roughly to the contours required, I then use a wet finger to smooth out the mix and get the exact contour and blend it into the edges.
The last series of shots is almost dry, this mix sets up quickly in the conditions faced today.  Hence better to do this in cooler weather.
When this stuff sets it gets rock hard due the addition of the Portland cement.
Next stage is to add the zip texturing to the Ground Goop, the zip texturing is coloured Patching Plaster.  I use a tan coloured mix of tempur powdered paints.
This stage can be fairly messy as the powdered mix (which is sieved) is very fine and laid onto the GG using a sieve, so before starting I mask of the painted areas that you do want covered in the mix.
More to follow...
Jas...

Sunday, 24 February 2013

LK&O RR - Layout Benchwork...


This is some seriously nice benchwork by a friend Alan Bailey on his LK&O RR layout.  This is the result of great time and effort in planning and construction.
This will be a rock solid foundation for a great layout...
Jas...
Here is a link to Alan's website:

www.LKOrailroad.com

Thursday, 21 February 2013

More Masking & a Drainage Pit...


Hi all,
Well more masking today on the L&T, the main entrance against the backdrop and around the backdrop structures and unloading area are finished.
Next step is to add sanded grout for the ROW, with some ballast in between the ties.  Other areas will be either loose or compacted gravel.
One thing I did alter was the drainage ditch coming from the JL&T module, I have extended the ditch onto the L&T area near the scratch built crossing.  And because of this I also added a scratch built (Evergreen Styrene) drainage pit to receive any excess storm water run off.
The next part of this section will be to add the "ground goop", zip texturing to form the land contours. Then the ties and rails will be airbrushed & weathered.  Then zip texturing, and finally sanded grout to other areas.  Once all this will then be weathered further using an airbrush and weathering chalks.
Stay tuned.
Jas...

Wednesday, 20 February 2013

Base scenery begins on the L&T...


Hi All,
Well I finally have started on the base scenery for the L&T Branch at its entrance.  The track work has been completed, the crossing installed and working and so begins the first step of the scenery.
I've started by adding masking tape to the base cork sub road bed, this forms the bare base that is painted with tan colour latex paint (the method that Joe Fugate uses), on top of this the zip texturing material will be added.
Masking tape added to sub road bed...

Monday, 18 February 2013

Scratch built crossing completed, and ready for weathering & ballasting...


Hi all,
Well last night I finished up the last couple of jobs to finish off the crossing, I added the last of the styrene ties, a few more track pins and tested out the electrical side of the crossing.
The outcome of the previous posts relating to the power issues stemmed from two things:
Bad pick ups in a couple of Athearn units & Not enough feeders leading into the crossing.
So these have all been fixed, and we are reading to weather & detail the styrene and track.  Here are few photos of the finished crossing and area before we start adding the scenery and ballasting the track...




Cheers,
Jas...

Tuesday, 5 February 2013

L&T Branch Entrance ready for Scenery...


Just a couple of quick photos of the L&T Branch entrance prepped and ready for the scenery to be added...
All the hard standing areas are in, track work finished, operational and tested.
Time to break out the airbrush & weathering chalks and place an order with Scenic Express for some real rock ballast...
More to follow soon.
Jas...