Tweaking the bridge/backdrop transition today, previously the bridge deck was sitting below the backdrop cut line. I wasn’t happy with it as you could see the cut in the backdrop through the bridge railing.
I’ve now raised the bridge about 20mm - 3/4” so that the bridge deck is in-line with backdrop cut line, and now hides the transition perfectly.
With a few vehicles strategically placed, the view is much better than before from both angles the scene can be viewed from.
No comments:
Post a Comment