Hi All,
Just a quick update to let you know what we are up to, seeing there has been a lull in my posts over the last month. The layout and I are on a small break at the moment with being busy with family, work and other commitments.
The next stage is completion of the remaining detection & signalling wire, and then onto working out our operations plan & scheme too.
I have been watching our "popular blog posts" feed and its been interesting watching posts move around and end up near the top. Of late some of my old posts from as far back as 2013 have been popping up into the feed which is great to see.
Even though the layout build progress has been slow, there is always time to switch a boxcars around the Reading Branch...
Jas...
Saturday, 21 May 2016
Tuesday, 12 April 2016
Back into the detection wiring again...
Now that school holidays have finished its back into the wiring of the blocks into the remaining two (2) BDL168's. The next section is the Rutherford to Manheim Junction section, this will use two of the four (4) blocks and eight (8) sensors.
The configuration is not really pretty but it works and makes problem solving much easier if required. The labelling is quite time consuming but again makes identifying the individual blocks easier.
Each zone wiring block is marked so that is identifiable from the other wiring under the layout. The red (thicker) wires are the block power feeds from the BDL, and the white (with red stripe) are the corresponding track feeder. The plain white wire is actually the black wire and common for the layout.
Keeping everything in order and labelled will save time in the future if you ever need to find faults in the detection wiring, it is also mind numbing and quite boring at times too. Checking each block when connected is essential when working with so many wires and feeders, already I have picked up un-isolated block boundaries that required insulated track joiners to be installed.
Two more zones (8 blocks) to go and onto the last BDL168...
Jas.
The configuration is not really pretty but it works and makes problem solving much easier if required. The labelling is quite time consuming but again makes identifying the individual blocks easier.
Each zone wiring block is marked so that is identifiable from the other wiring under the layout. The red (thicker) wires are the block power feeds from the BDL, and the white (with red stripe) are the corresponding track feeder. The plain white wire is actually the black wire and common for the layout.
Keeping everything in order and labelled will save time in the future if you ever need to find faults in the detection wiring, it is also mind numbing and quite boring at times too. Checking each block when connected is essential when working with so many wires and feeders, already I have picked up un-isolated block boundaries that required insulated track joiners to be installed.
Two more zones (8 blocks) to go and onto the last BDL168...
Jas.
Tuesday, 5 April 2016
Division & System Map...
For the last week and half I have been pretty much stagnant as far as layout time has been concerned as we are in the middle of our first term school break, and with this comes little to no time for the layout.
However over the last two days/nights I have been designing and completing our layout division/system map. It is now completed and has been designated as the "Harrisburg & Shippensburg Division - System Map 1975".
This has planted the layout in a era and will set the scene for the operating sessions on the layout. Whilst having a little get together a few weeks ago it was decided that we needed this map as it will allow operators to see the divisions and how to get to the specific towns and areas.
Hopefully once holidays are finished I can get stuck into designing the operating sessions.
Jas...
However over the last two days/nights I have been designing and completing our layout division/system map. It is now completed and has been designated as the "Harrisburg & Shippensburg Division - System Map 1975".
This has planted the layout in a era and will set the scene for the operating sessions on the layout. Whilst having a little get together a few weeks ago it was decided that we needed this map as it will allow operators to see the divisions and how to get to the specific towns and areas.
Hopefully once holidays are finished I can get stuck into designing the operating sessions.
Jas...
Tuesday, 15 March 2016
Sunday, 13 March 2016
Finishing off a little wiring...
So to complete the track work for the locomotive servicing facility, the Rutherford Yard industries including the wood chip mill I needed to install the extra track feeds to the track work.
The locomotive servicing facility was the most intensive due the amount of switches and sidings within the complex. To ensure that the number of sound equipped locomotives in the area didn't continuously keep tripping out the remainder of the layout I installed a PSX for the area.
The two extra industries will add a little variety to the operations of the Rutherford Yard area and allow crews operating the yard switches to take a break and do something a little different. The first area is at the north end of Rutherford Yard and is a wood chip paper mill that will supply the York Haven - Pulp & Paper Mill.
There will be another storage siding added to the right of the existing siding (with the three hoppers) to increase the overall capacity. My Walthers - Saw Mill kit along with the Saw Mill Outbuildings kit will be used in this along with some scratch built structures for the loading of the wood chips.
The second industry is still undecided as to what it will ultimately be, I am thinking along the way of a MOW depot with a small industry that supports and works well with it, say a cable manufacturer or something similar.
The best part of the two extra industries is the fact they are located on the ends of the yard and can be switched without interfering with the operations of the yard/layout.
I also had a chance to finish off the remaining section of fascia for the Rutherford Yard extension too, all that is left is to add the drop curtains and paint.
Jas...
The locomotive servicing facility was the most intensive due the amount of switches and sidings within the complex. To ensure that the number of sound equipped locomotives in the area didn't continuously keep tripping out the remainder of the layout I installed a PSX for the area.
The two extra industries will add a little variety to the operations of the Rutherford Yard area and allow crews operating the yard switches to take a break and do something a little different. The first area is at the north end of Rutherford Yard and is a wood chip paper mill that will supply the York Haven - Pulp & Paper Mill.
There will be another storage siding added to the right of the existing siding (with the three hoppers) to increase the overall capacity. My Walthers - Saw Mill kit along with the Saw Mill Outbuildings kit will be used in this along with some scratch built structures for the loading of the wood chips.
The second industry is still undecided as to what it will ultimately be, I am thinking along the way of a MOW depot with a small industry that supports and works well with it, say a cable manufacturer or something similar.
The best part of the two extra industries is the fact they are located on the ends of the yard and can be switched without interfering with the operations of the yard/layout.
I also had a chance to finish off the remaining section of fascia for the Rutherford Yard extension too, all that is left is to add the drop curtains and paint.
Jas...
Wednesday, 2 March 2016
TCS - WOW 101 Diesel Sound Decoder Install...
Ok now I know why TCS put the WOW at the start of their new diesel decoders...
They are that good thats all you can say... WOW!
The last two days I have been installing the first of the WOW Diesel decoders into a Athearn SW1500 switcher. The switcher was previously owned by Matt Fisher and was weathered & detailed for Matt by Tom Adair.
The switcher is the typical Ready To Run model from quite a few years ago, these are generally great slow speed runners but do need a little work to make them more reliable. If all wires are soldered to the board & truck tabs these become great runners.
For this installation I'm installing the TCS - WOW 101 Diesel Decoder.
The decoder has the 9 pin JST connection to it connects directly to the Athearn OEM board. There is actually a fair bit of room within the shell to fit the decoder and the wiring, it does come with a capacitor which needs to be fitted into the cab inbetween the electrical cabinets.
The only alterations required to the whole switcher was to trim off some plastic at the bottom of the cab to get the capacitor through, and to trim down the LHS electrical cabinet. I also used to opportunity to fit a Kato - Scale Engineer.
The speaker is a Soundtraxx - Small Oval Speaker (part no 810112) this fits in perfectly inside the shell and above the front truck with plenty of spare space. I would normally place the speaker in a baffled case but the shell not being opened through the vent top works well.
At a later stage I may make one to see if there is any improvement.
The install for such a small switcher went really well, I may in the future replace the standard Athearn bulbs in the lights with LED's but they are all working so no need. The rest of the RDG SW1500 will be getting this treatment as soon as the funds become available.
And I can honestly say that there will be no more Soundtraxx Tsunami's in our fleet! These things straight out of the packet, with virtually plug & play capability (I needed to solder the speaker to the wires) and the features are astounding. The sound needs to be heard in real life to full appreciate the CD Quality as stated.
Below is a short video showing the motor, horns, bell and manual notching sounds that are produced from the decoder. Once I've had a chance to get used to all of the functions I post another video of the switcher under load using the manual notching and switching Reading...
Jas...
Friday, 26 February 2016
Track Work Alterations Finished...
The last two days I have been working on finishing off the remaining changes & additions to the track work for Rutherford Yard and the Locomotive Servicing Facility including the new switch lead and river crossing.
I needed to add two double slip switches to the Rutherford Yard lead and add the switch lead which extends over the Susquehanna River (duck under) to the servicing facility. I was also waiting on a second Walther's Single Track - Truss Bridge which has now been finished and installed and the track work connecting the switch lead to the servicing facility is complete.
This will allow locomotives to be cut out of consists for maintenance, re-fuelling and/or sanding and keep the yard clear. It will allow interchange locomotives from the Shippensburg Classification Yard to also use the servicing facility too.
The final stage was the alteration and addition of the two double slip switches to the Rutherford Yard lead, and the addition of the switch lead too. These three key additions allow the yard to be switched and for cars to be cut and blocked without having to block or interrupt the main. It also allows locals to be dispatched to either the south (through Rutherford & Manheim) and to the north (via Carlisle Junction & Shippensburg).
The next stage is to test out the yard for operations and begin to map out and build the operating sessions for the layout.
Jas...
I needed to add two double slip switches to the Rutherford Yard lead and add the switch lead which extends over the Susquehanna River (duck under) to the servicing facility. I was also waiting on a second Walther's Single Track - Truss Bridge which has now been finished and installed and the track work connecting the switch lead to the servicing facility is complete.
This will allow locomotives to be cut out of consists for maintenance, re-fuelling and/or sanding and keep the yard clear. It will allow interchange locomotives from the Shippensburg Classification Yard to also use the servicing facility too.
The final stage was the alteration and addition of the two double slip switches to the Rutherford Yard lead, and the addition of the switch lead too. These three key additions allow the yard to be switched and for cars to be cut and blocked without having to block or interrupt the main. It also allows locals to be dispatched to either the south (through Rutherford & Manheim) and to the north (via Carlisle Junction & Shippensburg).
The next stage is to test out the yard for operations and begin to map out and build the operating sessions for the layout.
Jas...
Friday, 19 February 2016
More programming of the Panel Pro - Panel...
Whilst waiting for my next lot of track and turnouts to arrive I decided to work on the programming of the turnouts and blocks into the layout panel.
It is quite a mind numbing and repetitive task, but it is made a lot easier as JMRI can be quite portable even though our layout is run by a fixed desktop PC running Windows - XP.
JMRI has a neat little feature called WebServer, this allows you to remotely run or see what screens you have open in JMRI. So yesterday whilst programming the turnouts I need to record each of them on paper and the location and if they had an associated block (detection section) connected to them.
To do this I had WiThrottle running on my iPad (which has WebServer in the app too) and had the LocoNet Monitor tab up and running on it.
To ensure that the fascia push buttons are corresponding with the turnout address on the SE8C and that what is recorded is correct I can use the LocoNet Monitor to see the exact address being used by JMRI.
This allows me to move around under the layout and record on the layout sheets and label them as well without having to continually move back and forward from the PC to the area I'm working in. I can also bring the physical layout panel up to in WebServer to check block detection as well.
When all of this is recorded it's time to input it the information into the panel in Edit Mode. This is time consuming and requires a lot of double checking, sometimes need to be "inverted" so that they are showing the correct position on the panel and layout.
This is also a great time to see if the panel is corresponding to the physical layout relating to block and turnout positions. Once completed it will be time to add the signal logic to the centre peninsula area, we will be running the APB System on the layout.
Jas...
It is quite a mind numbing and repetitive task, but it is made a lot easier as JMRI can be quite portable even though our layout is run by a fixed desktop PC running Windows - XP.
JMRI has a neat little feature called WebServer, this allows you to remotely run or see what screens you have open in JMRI. So yesterday whilst programming the turnouts I need to record each of them on paper and the location and if they had an associated block (detection section) connected to them.
To do this I had WiThrottle running on my iPad (which has WebServer in the app too) and had the LocoNet Monitor tab up and running on it.
To ensure that the fascia push buttons are corresponding with the turnout address on the SE8C and that what is recorded is correct I can use the LocoNet Monitor to see the exact address being used by JMRI.
This allows me to move around under the layout and record on the layout sheets and label them as well without having to continually move back and forward from the PC to the area I'm working in. I can also bring the physical layout panel up to in WebServer to check block detection as well.
When all of this is recorded it's time to input it the information into the panel in Edit Mode. This is time consuming and requires a lot of double checking, sometimes need to be "inverted" so that they are showing the correct position on the panel and layout.
This is also a great time to see if the panel is corresponding to the physical layout relating to block and turnout positions. Once completed it will be time to add the signal logic to the centre peninsula area, we will be running the APB System on the layout.
Jas...
Friday, 5 February 2016
Fascia installed for the Loco Servicing Facility...
So today was an odd job day as I I'm waiting on the cork sheet for the loco servicing area, and some more turnouts from the USA.
So I decided to install the fascia to the Locomotive Servicing Facility area, this is also the dispatchers area & work bench (all underneath) so it was good to get this area finished and not have to worry about dust anymore.
The fascia is again the 3mm - 1/8" MDF board and continues on with the theme of the remainder of the layout, it is a little shorter as it has to just cover the LED tube work light and not block the dual monitors for the dispatcher.
The ability of the MDF to be able to be bent into a fairly tight radius makes the fascia flow really well and eliminates hard corners or angles.
To soften the corner on this section I have installed a hardwood end cap that is rounded and finishes off the end without any seams visible either.
Jas...
So I decided to install the fascia to the Locomotive Servicing Facility area, this is also the dispatchers area & work bench (all underneath) so it was good to get this area finished and not have to worry about dust anymore.
The fascia is again the 3mm - 1/8" MDF board and continues on with the theme of the remainder of the layout, it is a little shorter as it has to just cover the LED tube work light and not block the dual monitors for the dispatcher.
The ability of the MDF to be able to be bent into a fairly tight radius makes the fascia flow really well and eliminates hard corners or angles.
To soften the corner on this section I have installed a hardwood end cap that is rounded and finishes off the end without any seams visible either.
Jas...
Locomotive Service Facility...
Over the last two days we have been in the process of installing the Rutherford Yard switch lead which leads into the future Locomotive Service Facility.
In order to get the track levels and alignment right I decided to start the service facility track work. I had planned on a certain design but as normal it turned out to be a little different to the original on the plan.
The track to the left is the Gettysburg Interchange that runs into Carlisle Junction, the track on the right is the switch lead for Rutherford Yard that runs over the Susquehanna River over the new bridge that has been installed.
After the track design was finalised and photographed it was time to install the plaster/drywall sub roadbed to the service facility area.
Once some 3mm - 1/8" cork sheet arrives this will be placed over the plaster/drywall and the track work will be reinstalled.
I also installed the Midwest - Cork Roadbed to the switch lead & interchange tracks leading to the facility area.
Jas...
In order to get the track levels and alignment right I decided to start the service facility track work. I had planned on a certain design but as normal it turned out to be a little different to the original on the plan.
The track to the left is the Gettysburg Interchange that runs into Carlisle Junction, the track on the right is the switch lead for Rutherford Yard that runs over the Susquehanna River over the new bridge that has been installed.
After the track design was finalised and photographed it was time to install the plaster/drywall sub roadbed to the service facility area.
Once some 3mm - 1/8" cork sheet arrives this will be placed over the plaster/drywall and the track work will be reinstalled.
I also installed the Midwest - Cork Roadbed to the switch lead & interchange tracks leading to the facility area.
Jas...
Update on the new switch lead & river crossing...
So after adding the new timber frame to the duck under and cutting out the plywood top I decided to continue on and place the new switch lead bridge that crosses the Susquehanna River and install the river canyon into the timber frame work.
The river is cut into about half of the timber frame work and contoured to provided a steep and gradual slope on either side. The bottom will have a 3mm - 1/8" plywood bottom placed onto it and padded to stop those pesky head strikes on angled timber.
I also had time to install the front fascia for this section too...
The fascia continues the theme from the rest of the layout although a little shorter.
Jas...
The river is cut into about half of the timber frame work and contoured to provided a steep and gradual slope on either side. The bottom will have a 3mm - 1/8" plywood bottom placed onto it and padded to stop those pesky head strikes on angled timber.
I also had time to install the front fascia for this section too...
The fascia continues the theme from the rest of the layout although a little shorter.
Jas...
Monday, 1 February 2016
Construction of the new switch lead & bridge crossing...
So while waiting for the other double slip switch to arrive to complete Rutherford Yard track work I decided to start building the new frame work for the extension to the duck under.
The decision to extend the duck under was to allow the new switch lead for Rutherford Yard to extend across the main aisle of the layout to the locomotive service facility above the dispatchers desk.
The original version of the mainline bridge crossing from Harrisburg to Carlisle Junction over the Susquehanna River was designed to be lifted out if needed. And since starting five years ago the lift out has maybe been out twice. So the decision to make it permanently fixed has been made.
The existing frame work is quite sturdy so it only requires a little more to be added too. The pine timber is 120mm x 19mm and is covered with 12mm plywood, the river contour will be cut out at a later stage.
First step was to add the extra pine frame work:
The new frame work and existing is screwed back into the major benchwork, and if really needed could be removed at a later date.
Next step was to add the plywood top:
The addition of the new switch lead required the deepening & widening of the lead running in the bench work next to the mainline. It also required the alteration of the plywood that was placed in the wall cavity to stop locos & rolling stock taking the long drop down to the floor.
Once the grade and alignment was set it was time to add the Midwest Cork Roadbed, then once this had set to the bench work the grade had to be levelled to remove any undulations.
Then when this was correct the track work was added and checked along with the radius of the curve.
When I was happy with the track, roadbed, grade and radius of the curve it was time to setup the location of the new truss bridge. Fortunately the new bridge will be the same Walthers - Single Track Truss Bridge, so setting up was a matter of using the existing one for reference.
Next stage will be the installation of the remaining cork roadbed and track work...
Jas.
The decision to extend the duck under was to allow the new switch lead for Rutherford Yard to extend across the main aisle of the layout to the locomotive service facility above the dispatchers desk.
The original version of the mainline bridge crossing from Harrisburg to Carlisle Junction over the Susquehanna River was designed to be lifted out if needed. And since starting five years ago the lift out has maybe been out twice. So the decision to make it permanently fixed has been made.
The existing frame work is quite sturdy so it only requires a little more to be added too. The pine timber is 120mm x 19mm and is covered with 12mm plywood, the river contour will be cut out at a later stage.
First step was to add the extra pine frame work:
The new frame work and existing is screwed back into the major benchwork, and if really needed could be removed at a later date.
Next step was to add the plywood top:
The addition of the new switch lead required the deepening & widening of the lead running in the bench work next to the mainline. It also required the alteration of the plywood that was placed in the wall cavity to stop locos & rolling stock taking the long drop down to the floor.
Once the grade and alignment was set it was time to add the Midwest Cork Roadbed, then once this had set to the bench work the grade had to be levelled to remove any undulations.
Then when this was correct the track work was added and checked along with the radius of the curve.
When I was happy with the track, roadbed, grade and radius of the curve it was time to setup the location of the new truss bridge. Fortunately the new bridge will be the same Walthers - Single Track Truss Bridge, so setting up was a matter of using the existing one for reference.
Next stage will be the installation of the remaining cork roadbed and track work...
Jas.
Saturday, 30 January 2016
New Rutherford Yard Design & Altered Track...
Inline with the updated post below with the altered track plan, here a few photos of the new track work install.
I have installed one of the new PECO Code 75 - Double Slip Switches in the yard leads (north & south) that will allow both the southern & northern classification tracks to use the new switch lead (orange track).
The below plan shows the tracks and use (colour coded) along with some measurements of each...
The track work being altered and installed, this is the northern yard lead (right side) and the new switch lead to the left (coming off the dbl slip). The double slip allows for either of the three northern classification tracks to be switched onto the switch lead.
The north switch lead is 4.4 metres (14.4') long and is as long as any of the classification tracks.
The second double slip switch allows movement between both the northern & southern arrival/departure tracks and classification tracks, and shortens the existing crossovers that were installed by half.
By installing the double slips within the classification area of the yard we have also lengthened some of the classification tracks with the removal of excess crossovers too.
Next stage is to wait for one more double slip to arrive and install the remaining track, wire up and test out ready for another ops session.
I have installed one of the new PECO Code 75 - Double Slip Switches in the yard leads (north & south) that will allow both the southern & northern classification tracks to use the new switch lead (orange track).
The below plan shows the tracks and use (colour coded) along with some measurements of each...
The track work being altered and installed, this is the northern yard lead (right side) and the new switch lead to the left (coming off the dbl slip). The double slip allows for either of the three northern classification tracks to be switched onto the switch lead.
The north switch lead is 4.4 metres (14.4') long and is as long as any of the classification tracks.
The second double slip switch allows movement between both the northern & southern arrival/departure tracks and classification tracks, and shortens the existing crossovers that were installed by half.
By installing the double slips within the classification area of the yard we have also lengthened some of the classification tracks with the removal of excess crossovers too.
Next stage is to wait for one more double slip to arrive and install the remaining track, wire up and test out ready for another ops session.
Sunday, 17 January 2016
A few alterations to the track plan...
After last Tuesday nights Ops session Brendan and I were talking about a few little addition to the new Rutherford Yard area that would make it operate easier and add to the operations side of the layout.
So over the last few days I have been playing around with the configuration of the track on the Rutherford Yard leads and made a few little additions, some more permanent additions and added some more structures.
Below is the new version of the track plan in full:
This plan has been updated (30/01/16) to included two PECO Code 75 - Double Slip Switches, these and a few alterations to the track arrangement in the yard/switch leads will make the operations of the yard a lot more efficient.
The biggest additions to the track work are an extra spur/yard lead that now comes off the northern tracks of Rutherford Yard and heads over the Susquehanna River into the engine service facility.
It adds an additional bridge crossing over the river and will see the existing lift out bridge removed and changed to permanent benchwork with the bridges and track realigned and redone too.
Below is a close up view of the area with the additional yard lead, bridge and river crossing and connection into the service facility.
Again this plan is a blown up section of the new plan above...
The addition of the yard lead which also enters the service facility ends up adding some improved ops capability by allowing locomotives to offload their cars into the yard then shoot out one the lead into the facility for refuelling, sanding and/or maintenance.
It will also allow the yard switchers to use it for storing a cut of cars or blocking duties with fouling the northern main anymore.
In all relatively small change but with some great value add options to the overall layout operating scheme.
And lastly I have also made a small alteration to the York - Pulp & Paper Mill with the addition of a wood chip unloading spur to the south of the pulp wood sidings.
Jas...
So over the last few days I have been playing around with the configuration of the track on the Rutherford Yard leads and made a few little additions, some more permanent additions and added some more structures.
Below is the new version of the track plan in full:
This plan has been updated (30/01/16) to included two PECO Code 75 - Double Slip Switches, these and a few alterations to the track arrangement in the yard/switch leads will make the operations of the yard a lot more efficient.
The biggest additions to the track work are an extra spur/yard lead that now comes off the northern tracks of Rutherford Yard and heads over the Susquehanna River into the engine service facility.
It adds an additional bridge crossing over the river and will see the existing lift out bridge removed and changed to permanent benchwork with the bridges and track realigned and redone too.
Below is a close up view of the area with the additional yard lead, bridge and river crossing and connection into the service facility.
Again this plan is a blown up section of the new plan above...
The addition of the yard lead which also enters the service facility ends up adding some improved ops capability by allowing locomotives to offload their cars into the yard then shoot out one the lead into the facility for refuelling, sanding and/or maintenance.
It will also allow the yard switchers to use it for storing a cut of cars or blocking duties with fouling the northern main anymore.
In all relatively small change but with some great value add options to the overall layout operating scheme.
And lastly I have also made a small alteration to the York - Pulp & Paper Mill with the addition of a wood chip unloading spur to the south of the pulp wood sidings.
Jas...
Thursday, 14 January 2016
Another Ops Session & Rutherford Yard Test...
So Tuesday night was our semi-regular ops session again for the first time in 2016.
Unfortunately as we were busy problem solving and entertaining I didn't get any ops photos or videos. Next ops session there will be both...
We had our regular crew of Noel, Dennis & Brendan, and a first time visit from Greg who is also within the greater Melbourne N Scale group. Noel also brought along his friends from South Australia - Warren and his son Charlie.
The night started out fairly slowly with our usual light hearted banter and catch-up conversation from what we had all done over the festive season.
Brendan and I identified a issue with the LocoNet and one of the BDL's presenting with some odd behaviour.
In the end the BDL issue was problem solved down to being none of them had been set to be the BDL master on the LocoNet. Problem solved by Dr DCC himself Brendan after the session had finished. Greatly appreciated all your help too Brendan!
The rest of the night sore the guys running trains over the entire layout without to many hiccups or issues. Greg seemed to spend a fair amount of time on the completed Reading branch switching locals around. Noel chaperoned Warren & Charlie around whilst Charlie ran a few locals with him.
Brendan seemed to have the most fun, and was clearly the "BOL" (Best On Layout) for moving freight. He also gave the yard a good workout, and we also identified some additions to it that will make it operate better and add value to the layout ops as well.
A very enjoyable night was had by all!
Jas...
Unfortunately as we were busy problem solving and entertaining I didn't get any ops photos or videos. Next ops session there will be both...
We had our regular crew of Noel, Dennis & Brendan, and a first time visit from Greg who is also within the greater Melbourne N Scale group. Noel also brought along his friends from South Australia - Warren and his son Charlie.
The night started out fairly slowly with our usual light hearted banter and catch-up conversation from what we had all done over the festive season.
Brendan and I identified a issue with the LocoNet and one of the BDL's presenting with some odd behaviour.
In the end the BDL issue was problem solved down to being none of them had been set to be the BDL master on the LocoNet. Problem solved by Dr DCC himself Brendan after the session had finished. Greatly appreciated all your help too Brendan!
The rest of the night sore the guys running trains over the entire layout without to many hiccups or issues. Greg seemed to spend a fair amount of time on the completed Reading branch switching locals around. Noel chaperoned Warren & Charlie around whilst Charlie ran a few locals with him.
Brendan seemed to have the most fun, and was clearly the "BOL" (Best On Layout) for moving freight. He also gave the yard a good workout, and we also identified some additions to it that will make it operate better and add value to the layout ops as well.
A very enjoyable night was had by all!
At the end of the night, and everyone had left I grabbed the iPhone and WiThrottle and switched Rutherford Yard for about 45 mins, it's only ever going to be a small classification yard for a couple of locals and maybe a full consist train but it's going to be a lot of fun too.
This is how it ended up looking...
Jas...
Subscribe to: